Powering Ballarat East Control & Switchroom Manufacturing, Delivery and Installation

Delivery of two critical components for Powercor’s
0

SRS Power and ODLS are proud to have played a crucial role in the manufacturing and delivery of two critical components for Powercor’s new $30 million zone substation in Ballarat East — a state-of-the-art Control Room and Switch Room, designed to support the region’s growing energy demands and bushfire safety initiatives.

BAE 2 sheds & pilot

Manufactured at SRS Power facility in Dandenong South, the buildings were engineered to exacting standards over a six-month period. The Switch Room, tailored to house specialised ABB control equipment, measures 25.4m x 6m x 3.95m and weighs approximately 50 tonnes. The larger transport configuration reached an impressive 45m in length, weighing 141 tonnes in total.

As one of Australia’s largest switchboard & Portable Building manufacturers, SRS Power brings over 30 years of experience delivering innovative, custom-built solutions across industries. Backed by ISO 9001:2015 certification, advanced technical capabilities, and a highly skilled team, SRS Power ensures consistent quality, reliability, and on-time delivery.

Delivery and installation equipment were expertly handled by Overdimensional Lift & Shift (ODLS), whose 40+ years of experience in heavy haulage ensured a seamless execution. ODLS conducted a full route inspection, collaborated with Powercor and Ballarat City Council to manage vegetation and road furniture, and coordinated the raising of 180 overhead lines across a 3km stretch to accommodate the transport height.

600-tonne Overhead Lift System

On-site, ODLS deployed their 600-tonne Overhead Lift System, using custom-engineered beams to precisely lift and side-shift the cargo into its final position — all within a compact footprint and with minimal ground pressure.

This project exemplifies the power of collaboration, precision engineering, and logistical excellence. A huge thank you to SRS for entrusting the ODLS Team with this highly specialised project, Powercor, ABB and all partners involved in delivering this vital infrastructure for Ballarat’s future.